Outlook Christian Church

ASG2.jpg
ASG3.jpg

Outlook Christian Church was in a phase two expansion of their campus and needed a new audio, video, and lighting system for their new 25,200-square-foot area youth worship space.

Advanced Systems Group (ASG) was chosen early in the planning process as the preferred technology integrator.

ASG ensured that each performance area was integrated with a complete audio, video, and lighting system, utilizing as much of the church’s existing equipment as possible.

Phase two’s “New Wing” added the following to the existing worship center:

  • 17 classrooms connected to a two-way intercom system allowing for general announcements or two-way communication from the school office to individual classrooms
  • Upgrade to the main auditorium’s video projection system from VGA to a full 1080p, high-definition system